DOTP With IBC Tank
  • DOTP With IBC Tank
  • DOTP With IBC Tank
  • DOTP With IBC Tank
  • DOTP With IBC Tank
  • DOTP With IBC Tank
  • DOTP With IBC Tank
  • video

DOTP With IBC Tank

CAS:6422-86-2
Formula: C24H38O4
Dioctyl terephthalate, as a Environmental protection plasticizer, is widely used in medical gloves, protection suit, medical equipment, food packaging, cable outer protective cover, children's toys, automotive interior products, paint, footwear and other industries.

DOTP With IBC Tank

DOTP with IBC tank

 

DOTP with IBC tank

Parameter

 

Index name

Index

Superior products

First-grade products

Qualified products

Appearance

Transparent oily liquid without visible impurities

Chroma, (Pt Co) No≤

30

50

100

Purity (GC),% ≥

99.5

99.0

98.5

Density(ρ20),g/cm3 

0.981~0.985

Acid value, mgKOH/g ≤

0.02

0.03

0.04

Moisture,% ≤

0.03

0.05

0.10

Flash point (open cup method), ℃ ≥

210

205

Volume resistivity(1010Ω·m) ≥

2

1

0.5

 

Performance and Applicatiom

Dioctyl terephthalate is a transparent oily liquid, with the molecular formula of C24H38O4, molecular weight of 390.55, relative density (20/20 ℃) of 0.98, freezing point of - 48 ℃, boiling point (0.8kPa) of 370 ℃, and density (solid) of 1.527g/cm3. It is insoluble in water and soluble in general organic solvents.

Dioctyl terephthalate is mainly used to soften PVC products. It has the advantages of heat resistance, cold resistance, volatility resistance, extraction resistance, flexibility and good electrical insulation. It is widely used in medical gloves, protection suit, medical equipment, food packaging, cable outer protective cover, children's toys, automotive interior products, paint, paint, footwear and other industries.

 

DOTP with IBC tank

About the Package and Delivery

We can do the delivery as soon as we receive the full payment, according to your requirement.

Tere are 4 kinds of packages available:

  1. 200kg Iron drums

  2. 1000kg IBC drums

  3. 23mt Flexibag

  4. 24.8mt ISO TANK

DOTP with IBC tank


Social Responsibility


On the morning of January 30th, the Yuwangtai District 2023 ‘Three batches of projects ’centralized construction activities " Sponsored by the CPC Yuwangtai District Committee and the Yuwangtai District People's Government and co-organized by Kaifeng Ruihong Chemical Co., Ltd., was successfully held in the factory area of Kaifeng Ruihong Chemical Co., LTD. Five projects worth more than 100 million yuan were started, with a total investment of 6.43 billion yuan and an annual planned investment of 3.89 billion yuan.

 

 Kaifeng Ruihong Chemical Co., Ltd. is the holding subsidiary of Kaifeng Jiuhong Chemical Co., Ltd., which is the only project with a total investment of more than 5 billion yuan in this centralized construction activity. Zhang Zuli, general manager of Kaifeng Jiuhong Chemical Co., LTD., as the general person in charge of Ruihong chemical project construction, spoke in the event, mainly explaining the overall progress of Ruihong chemical project, the product market prospect and the value expected to create. 

 

 Zhang Zuli in a speech stressed at the same time: Ruihong chemical will unswervingly support the municipal party committee and municipal government "manufacturing city" decision work deployment, efforts to achieve yu wangtai district "stronger do best do big fine chemical industry cluster, high quality build billions of industrial cluster" grand goal, concentrated advantage resources, elaborate organization, careful management, careful construction, to promote the project construction, for project of early construction, early production, early benefit. In the increase of employment and tax payment to release great energy, to promote the economic development of Yuwangtai District and Kaifeng City "manufacturing city" contribution.


DOTP with IBC tank

FAQ

 

Q1: Are you the trading company or manufacturer ?
A: We are the manufacturer.

 

Q2: Can I get a free sample?
A: Yes, a sample less than 2 kg is free, you only need to pay the delivery cost.

 

Q3. What is your terms of payment?

A:We prefer TT, 30% as deposit, and 70% before delivery. but other ways is also negotiable.

 

Q4: How long is your delivery time?
A: We can do the delivery as soon as the payment.


Q5. Do you test all your goods before delivery?

A: Yes, we will test the product at least 3 times during the producing, And before delivery we will test it again.

Workshop
Workshop
Product Tag:
Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right